Guide for applicants

Respond to a correction letter

Read the one consolidated letter for your record, upload a revised file for each comment and resubmit. You stay on the same record and keep the same record number.

Before you start

Have these ready so you can finish in one sitting. This guide is for a resident or contractor who has a submitted record.

  • Your record number, from the confirmation email after you submitted
  • The consolidated letter, with all department comments in one list
  • Revised files, named clearly and saved where you can find them
  • Sign-in to the portal account linked to the record, or the secure link staff sent for this record

Note: A saved draft is not a submitted record. You need a submitted record to receive a correction letter.

Steps

Use the exact section names on your record. Do the steps in this order.

  1. Open the record

    Sign in and open My records. Choose the record by its record number. Open Documents and read the latest consolidated letter first.

  2. Read each comment

    Check the discipline, sheet and location for each comment. Read what change is asked for and the date the response is due.

  3. Upload a revision

    Choose the document type that matches the comment. Upload the revised file as a new version. Do not start a new application for the same work.

  4. Note what changed

    Add a short note for each comment. Say what changed, on which sheet or page, and how it answers the comment.

  5. Resubmit

    Open Review and confirm every comment is answered, or explain why an item cannot be done yet. Choose Submit for re-review and save the confirmation.

What happens next

Re-review goes back to the same disciplines that commented, so they can verify their own items.

  • Each reviewer marks a comment as verified, kept open or waived with a reason
  • If comments remain, you receive one new consolidated letter, not separate department letters
  • The record status and next step change on your record, and a notice is sent by email
  • Earlier plan versions stay readable on the record for reference

Contractor and reviewer handoff, with sign-off on the same record

Use this handoff for every correction cycle. The contractor, each reviewer, the permit technician and the decision role each own one part, and the record shows who signed off, what was checked and what happens next. The handoff replaces a separate spreadsheet tracker, because the record, the letter, the revised version and the sign-off stay together in the workspace.

  1. Contractor hands off a revision

    Owner: contractor or applicant on the record. Upload the revised file as a new version, add a note for each comment that names the sheet or page that changed, and submit for re-review. Sign-off from this step is the resubmittal note on the record, not a message outside the record.

  2. Reviewer signs off each comment

    Owner: the reviewer for that discipline. Compare the new version with the open comment, then mark the comment verified, kept open or waived with a reason. A comment closes only on a verified or waived sign-off. Kept open comments stay on the next consolidated letter.

  3. Permit technician checks the record before decision

    Owner: permit technician. Confirm every required comment is verified or waived, the current version is the only current version, and fees, conditions and prerequisites listed on the record are met, paid or waived where the record allows it. Record any missing item on the record and return the record to the step that owns it.

  4. Decision role signs off the permit

    Owner: department head or the assigned decision role for the type, as shown on the record. Approve, deny or issue only after the technician check is complete. The decision, the reason where the record is denied and the next step are written to the record history, so the contractor sees the same sign-off the reviewers signed.

What each handoff shows on the record
HandoffOwnerChecklist before sign-offSign-off on the record
Contractor to reviewerContractor or applicantRevised file uploaded as a new version, one note per comment, sheet or page named for each change, resubmitted for re-reviewResubmittal note and new version, dated on the record
Reviewer to permit technicianReviewer for the disciplineEach comment compared with the new version, verified, kept open or waived with a reason, no comment left without a sign-offVerified, kept open or waived status on each comment, with the waiver reason where waived
Permit technician to decision rolePermit technicianAll comments verified or waived, fees and conditions listed on the record checked, prerequisites listed on the record checked, missing items returned to the owning stepTechnician check on the record, with any missing item named and sent back to its owner
Decision role to contractorDepartment head or assigned decision roleReviewer sign-offs complete, technician check complete, decision and next step stated in plain wordsDecision in the record history, with the issued permit or the reason and next step where denied
  • One record number for the whole handoff, assigned once at submission and never reused, so the letter, versions, comments and sign-offs cannot drift to a second tracker
  • Only one plan version is current at a time, earlier versions stay readable, and each reviewer signs off the current version
  • Every sign-off writes a history entry, the status and the applicant next step update on the same record, and internal notes never appear in the portal
  • Repeat the same four handoffs for the next cycle where comments remain, with one new consolidated letter and the same owners

Permits and plan review · Upload plans and documents · Apply for a permit online

Threaded messages

Applicant messages and reviewer replies in one thread on the record

Use Messages on the same record to ask a question about a comment, a document or the next step, and read the reply in the same thread. Messages are part of the signed-in installable app. Sign in at Sign in, install the app from the signed-in app at /app/ and open the record to use Messages. A message thread is not a new application, and it is not a substitute for uploading a revised file. The letter, the revised version, the thread and the sign-off stay on the one record, so the answer stays with the comment and other reviewers can see it.

  1. 1. Open Messages on the same record

    Sign in, open the record by its record number, and open Messages on that record. Do not start a new application and do not upload a revision to a new record for the same work.

  2. 2. Quote the record number and the comment

    Write the record number in every message. Where the question is about a comment, quote the comment number and the sheet or page, and ask the exact question you need answered. Keep private details out of the message.

  3. 3. Read the reply in the same thread

    Read the reply in the same thread on the same record, and check the status and next step on that record at the same time. A reply does not change the record number, the current plan version or the fee lines on the record.

  4. 4. Reply again in the same thread if needed

    If the reply does not answer the comment, reply again in the same thread with the comment number and sheet. Do not open a second thread on a second record for the same comment, and do not rely on a message outside the record as the sign-off.

  • One thread per record, so the question, the reply and the comment stay together
  • Staff with a PermitDesk role for that record also use the same thread on that record, and staff make every decision on the record
  • The record status and next step update on the same record when a decision or a status change is made

Portal · Security

Comment to resubmittal loop

Record one resolution for each comment, with evidence

Use one row for each comment in the consolidated letter. The row ties the required change to the resolution you submit and to the evidence the reviewer checks, on the same record and with the same record number.

One row for each comment in the consolidated letter
Comment from the letterResolution note you addEvidence you uploadReviewer sign-off
Comment number, discipline, sheet and location, and the required change as written in the letterWhat changed, on which sheet or page, in your words, for that one comment onlyNew version number, file name, date uploaded, and sheet or page that shows the changeVerified, kept open, or waived with a reason, recorded by the reviewer for that discipline
  1. Copy each comment into its own row

    Open the consolidated letter in Documents. For each open comment, copy the comment number, discipline, sheet and location, and the required change into one row. Do not combine two comments in one row and do not leave a comment without a row.

  2. Add a resolution note for that comment

    In the row for that comment, state what changed and where it changed, by sheet or page. Write the note so the reviewer for that discipline can find the change without reading the other rows.

  3. Upload the evidence as a new version

    Upload the revised file to the same record as a new version. In the row, record the new version number, file name, date uploaded, and sheet or page that shows the change. Earlier versions stay readable, and only one version is current at a time.

  4. Check every row before you resubmit

    Before you choose Submit for re-review, check that each row has a resolution note and evidence, that no required comment is missing a row, and that the file name and sheet or page in the row match the uploaded version. If a comment cannot be answered yet, state that in its row and keep the record in corrections.

  5. Read the reviewer sign-off on each row

    After re-review, read the sign-off on each row. A comment closes only when the reviewer marks it verified or waived with a reason. A comment marked kept open stays on the next consolidated letter, with a new row for the next cycle, on the same record and with the same record number.

  • One record number, one consolidated letter per cycle, and one current version at a time, so the letter, the evidence and the sign-off cannot drift to a second tracker
  • Every sign-off writes a history entry, and the status and next step update on the same record
  • Do not start a new application for the same work, and do not upload a revision to a new record, the revision would not be linked to the comment

Permits and plan review · Upload plans and documents

If a comment is unclear

Ask on the record, so the answer stays with the comment and other reviewers can see it.

Open the Messages section on the same record and reply in the same thread. Quote the comment number and sheet, and ask the exact question you need answered.

Do not start a new application and do not upload a revision to a new record. A new record would not be linked to the comment.

Can I reply to only some comments now

Yes. Upload what you have, note what changed, and say in your resubmittal note which comments remain. The record stays in corrections until all comments are verified or waived.

What if a file is the wrong type

Choose the document type before you upload. The portal lists the accepted types and sizes for your record type. If an upload is rejected, the screen states the reason and nothing is submitted.

Related guides

Upload a file, check a public record or pay a fee when your record asks for it.